Is Your Heat Transfer Equipment Ready for Winter Operation?

As operating conditions change through autumn and winter, heat transfer equipment may be asked to perform under a different set of demands. Heaters and pre-heaters can become increasingly important, while cooling equipment may face changes in ambient temperature, fluid properties and operating patterns.

A planned review before the colder period can identify deteriorating performance, leakage or maintenance requirements while there is still time to respond.

Review recent operating performance

Maintenance planning should begin with the way the equipment has been performing. Gradual changes can be easy to overlook, particularly where operators have compensated by adjusting other settings.

Questions worth asking include:

  • Is the required outlet temperature still being achieved?
  • Has pressure drop increased?
  • Are pumps, fans or control systems working harder?
  • Has warm-up time increased?
  • Are there signs of unstable temperature control?
  • Have leaks or repeated topping-up been recorded?

Comparing current readings with earlier operating records can reveal trends that a single inspection may not show.

Inspect heaters and pre-heaters

Equipment used for space heating, process heating or fluid pre-heating may spend part of the year idle or operating at reduced load. Before demand increases, inspect accessible surfaces, connections, valves and supporting structures for corrosion, leakage or physical damage.

Where coils are exposed to air, contamination on the heat-transfer surface can restrict airflow and reduce output. Bent or damaged fins may also affect performance. Any cleaning method should suit the construction and avoid causing further damage.

Check cooling equipment too

Cold weather does not remove the need for reliable cooling. Charge air coolers, oil coolers, water coolers and other heat exchangers must continue to control temperatures across engines and industrial systems.

Lower ambient conditions may alter system behaviour, but they do not correct internal fouling, restricted flow or deteriorating components. A unit that has been operating close to its limit may still create problems when loads or control conditions change.

Look for leakage and corrosion

Small signs can provide an early warning of a larger issue. Staining, deposits around joints, unexplained fluid loss and localised corrosion should be investigated. Where two circuits are separated within the exchanger, internal leakage may cause contamination without an obvious external leak.

Connections, covers and gaskets should be included in the inspection. The source of a leak needs to be confirmed before deciding whether tightening, gasket replacement, repair or more extensive work is required.

Consider frost and idle-equipment risks

Equipment exposed to low temperatures may be vulnerable if water or another freezing fluid remains trapped inside. Site procedures should address draining, isolation, circulation or suitable protection according to the system design and operating requirements.

Particular attention may be needed where equipment is outdoors, in unheated spaces or taken out of service for extended periods. Any winterisation activity should follow the site’s engineering and safety procedures.

Confirm that critical spares and records are available

An inspection may identify an ageing gasket, damaged coil or cooler that is becoming difficult to support. Confirming identification details and investigating replacement options early can reduce pressure if the condition worsens during a busy operating period.

Keep photographs, nameplate information, drawings and recent performance records together. These details can shorten the initial assessment and help establish whether cleaning, repair or replacement should be considered.

Plan before performance becomes critical

AMI Exchangers manufactures and supports heat transfer equipment for marine and industrial applications, including heaters, pre-heaters and a wide range of cooling products.

If an existing unit is leaking, underperforming, obsolete or becoming difficult to maintain, our team can review the available equipment details and operating information.

Speak to AMI Exchangers about inspection findings, replacement equipment and planned heat exchanger requirements.